DICT Header Logo
PROVISION OF INTERNET CONNECTIVITY SERVICES IN MUNICIPALITIES - PHASE 1 IN THE PROVINCE OF BULACAN
SITE SURVEY FORM
SITE DETAILS
Code:
Name:
Type:
Location:
Item Yes/No Remarks
• Wi-Fi Access Point (AP)
1. Installation Location
1.1 Secured and/or access requires additional tools such as ladder (min. of 3 meters HT)
2. Coverage Area
2.1 Signal must be able to propagate in areas accessible to the public (at least 50 meters)
2.2 Area must be able to induce/serve the designed and subscribed number of concurrent users
3. Prioritization of possible COVERAGE targets
3.1 Primary Priority (general public area, relatively accessible) For State University and Colleges:
Tech4Ed, Admin Building, Library, Cashier, Computer Laboratory, Gymnasium, University Ground etc.
For Hospitals:
Malasakit Center, Lobby, OPD, Cashier, Waiting area etc For Provincial Government Offices:
Lobby, Plaza, GF, 2F etc.
4. Location of Access Point Coordinates
• Communication Box (COMM BOX)
1. Location
1.1 Secured and/or access requires additional tools such as ladder (min. of 3 meters HT)
1.2 Coordinates - ICT Office
1.3 Must be in a very secure area with shelter or shade, if possible
2. Distance to Electrical Tapping Point
2.1 Must have maximum 100 meters cabling distance from/to possible electrical tapping point
• Electrical Tapping Point
1. Minimum Current
1.1 Tapping point has a minimum current of 5A
2. Location
2.1 Tapping point must be secured
3. Distance to Comm Box
3.1 Must have maximum 100 meters cabling distance from/to possible communication box location
• Electrical Tapping point and Breaker Location:
📷 Click to upload photo Proposed Tapping Point
PROPOSED TAPPING POINT
📷 Click to upload photo AC Cable Routing
PROPOSED CB & AC CABLE ROUTING
SITE PHOTOS (1/2)
📷 Click to upload photo Location of Commbox
LOCATION OF COMMBOX
📷 Click to upload photo CommBox Room
COMMBOX ROOM
SITE PHOTOS (2/2)
📷 Click to upload photo Access Point 1
ACCESS POINT 1
📷 Click to upload photo Access Point 1 Coverage
ACCESS POINT 1 COVERAGE
📷 Click to upload photo Access Point 2
ACCESS POINT 2
📷 Click to upload photo Access Point 2 Coverage
ACCESS POINT 2 COVERAGE
📷 Click to upload photo Starlink Location
STARLINK LOCATION
📷 Click to upload photo Municipal Building Exterior
MUNICIPAL BUILDING EXTERIOR
FLOOR PLAN
📷 Click to upload Floor Plan Layout (Floor 1) Floor Plan Layout Floor 1
HEAT MAP
📷 Click to upload Heat Map Image (Floor 1) Heat Map Coverage Floor 1
NOTED BY:

Site Coordinator


Contact Details
PREPARED BY:

Personnel


Survey Date
INSTRUCTIONS:
For Access Point: All Installation Location and Coverage Area Criteria are to be met. For exceptions, feel free to consult DICT Region 3 Wi-Fi Team.